COAL COMBUSTION RESIDUAL
CCR / CCP MANAGEMENT SOLUTIONS BUILT FOR SAFETY, COMPLIANCE & ENVIRONMENTAL PROTECTION
Thalle Construction Company provides comprehensive CCR/CCP management services that help utility partners safely remediate legacy ash basins, stabilize active sites, and meet stringent state and federal regulatory requirements. With proven expertise in large-scale excavation, hauling, dewatering, material consolidation, liner system construction, and beneficial reuse operations, we deliver every phase with precision and a strict commitment to environmental protection. Our teams are experienced in handling both dry and saturated materials, working within sensitive containment areas, and maintaining constant compliance with environmental controls.
Whether constructing new lined disposal cells, closing and capping existing impoundments, installing groundwater and stormwater control features, or executing full basin closures, Thalle delivers reliable, field-proven solutions focused on long-term safety and environmental performance. We integrate high-volume earthmoving capabilities, strong environmental stewardship, and transparent project management to help clients reduce risk, protect surrounding communities, and achieve regulatory compliance with confidence. Our CCR/CCP services provide a safe, responsible, and durable path toward closure and long-term site stability.
GALLERY OF PROJECTS
CASE STUDY
TVA PARADISE FOSSIL PLANT
LANDFILL CELL 1A CONSTRUCTION
Thalle Construction delivered the full civil and environmental construction package for TVA’s Landfill Cell 1A at the Paradise Fossil Plant (PAF) in Muhlenberg County, Kentucky. This 13-acre industrial landfill unit was designed to safely contain coal combustion residuals (CCR) in accordance with stringent federal and state regulatory standards—supporting TVA’s long-term commitment to environmentally responsible waste management and site stewardship.
The project began with extensive earthwork and subgrade preparation followed by installation of a geologic barrier and engineered composite liner system to protect groundwater resources. Thalle constructed a complete leachate collection and transmission network, including a lined leachate lagoon, conveyance piping, and structural drainage features to ensure reliable and compliant long-term operation. Additional scope included sedimentation basins, perimeter roadways, stormwater controls, and supporting earthwork, all sequenced to maintain environmental protections throughout construction.
Working within an active power-generation environment required strict adherence to safety, environmental controls, and compliance protocols. Thalle’s team maintained consistent quality oversight while coordinating closely with TVA’s environmental and operational staff to ensure all work met the regulatory framework governing CCR management.
The successful completion of Landfill Cell 1A reinforced Thalle Construction’s reputation as a trusted partner in coal combustion residuals (CCR) infrastructure, combining large-scale earthmoving capabilities with disciplined environmental stewardship. Our work at the Paradise Fossil Plant demonstrates our ability to deliver safe, durable, and fully compliant containment solutions that support long-term site stability and responsible resource management.