Hickory Log Creek Dam

Canton, Georgia

The City of Canton and Cobb County-Marietta Water Authority (CCMWA) contracted Thalle to construct a new roller-compacted cement (RCC) dam on the Hickory Log Creek. It was completed in December 2007, on time and within budget, despite a demanding schedule and completion date. The dam is 950 feet wide and 180 feet high making it one of the largest dams in the state of Georgia not built by the Corps of Engineers or Georgia Power. It is the highest RCC dam in North America. The reservoir behind the dam will hold 5 billion gallons of water and will provide an additional source of drinking water for the area.

This new concrete gravity dam consists of 235,000 cubic yards of roller compacted concrete and over 12,000 cubic yards of cast-in-place concrete. All concrete for the project was mixed on site and transported to the dam site via a 1500 foot conveyor system. In addition to the placement of RCC, other challenging aspects of the project included extensive rock excavation and removal, foundation grouting, instrumentation, hydraulic crest gates, sluice gates and access roads. A great deal of time was spent throughout the entire project on safety measures to support the workforce. The project team creatively designed a work platform on the top of the dam to construct the spillway. The solution eliminated potential fall hazard and allowed work to be performed in an efficient manner. Additional appurtenant items included a control building; large diameter welded steel pipe; electrical instrumentation and a 252 foot long pedestrian bridge.

To tour the future Hickory Log Creek Dam & Reservoir click the image to launch the video or click here.

Photo-Video1

Click here to view our Advertisement and click here to read the article published in Hydro Review Worldwide (HRW), March 2008. The issue featured an article about Hickory Log Creek Dam in Canton, GA. Thalle Construction was awarded the contracts for Phase I and Phase II of the project. The dam was successfully completed in January, 2008, on time and within budget. To read the feature article, go to Press Releases.

Back to Dam Construction

Rectangular-Gray1
Hickory Log Creek Dam, Canton GA

Hickory Log Creek Dam, Canton GA

Hickory Log Creek Dam, Canton GA

Hickory Log Creek Dam, Canton GA

Hickory Log Creek Dam, Canton GA

Hickory Log Creek Dam, Canton GA

 

Line-Gray1

Home . About Us . Projects . Materials . News . Employment . Contact Us

Copyright © 2010, Thalle Construction Company. All Rights Reserved. www.thalle.com

 