Erosion and settlement repairs to the existing closed landfill, as well as construction of two new landfill cells, adding approximately 17 acres to the active landfill.
Significant scope items included:
- 780,000 cubic yards of excavation.
- A 1.5 foot compacted soil liner.
- A geosynthetic liner system.
- An HDPE leachate collection system.
- A crushed stone collection layer.
- Operational cover.
This project was completed in July of 2011.