60-acre Class I Landfill Closure consisting of Earthwork, Geosynthetic liner, Gas extraction Wells and Piping, Storm Water Piping and Conveyance Systems, and Material Stockpiling.
Get the details ›
Thalle Construction completed Phase 2 and Phase 6, and is currently working on Phase 5 of the 7-mile James River Interceptor replacement project. The project involves rerouting the city's existing sewage collection system, and installing a new 54-inch sanitary sewer main. As the work progresses, the new lines require working in cramped areas between the railroad and the James River, as well as heavy construction in Lynchburg's historic downtown riverfront district.
Get the details ›
Erosion and settlement repairs to the existing closed landfill, as well as construction of two new landfill cells, adding approximately 17 acres to the active landfill.
Get the details ›
Thalle capped an existing landfill cell for the Orange County Public Works Department.
Get the details ›
Thalle Construction is working with the US Army Corps of Engineers on a large, long-term project that will double the capacity of the locks that allow barge and boat traffic around the Kentucky Dam.
Get the details ›
Thalle rerouted a creek bed and a major sewer line, installed a new earthfill dam, and added streambank improvements and stabilization in order to improve a trouble spot in the stormwater management system of Kennesaw, GA.
Get the details ›
Prompton Dam - Prompton State Park, PA
Thalle Construction rebuilt the spillway around Prompton Dam, built a new concrete bridge over the spillway, added a new maintenance facility for the Corps of Engineers, and made numerous minor improvements to the roads in the park.
Get the details ›
Thalle worked to combine 2 of the 3 reservoirs at the Franklin Water Treatment plant into one large reservoir, along with the inlet and overflow structures, and thousands of feet of new pipework. The project helped improve both the capacity and the reliability of the water supply for the city of Charlotte and Mecklenburg County.
Get the details ›
Thalle Construction built a fly ash landfill for the new coal-fired power plant at Cliffside Steam Station in North Carolina. Thalle was also contracted to expand the power plant's rail facilities and various other erosion control improvements in the area.
Get the details ›
Thalle added a new cell to the existing White Oak landfill complex.
Get the details ›